TES-P-122.07 : Transmission Structure spotting Pads and Roads :

ransmission line plan and profile drawings are essential throughout the design and construction process. They begin with route surveys to map features along the proposed line, guide design tasks like structure placement, assist in material procurement and construction, and serve as permanent records for future operations and maintenance. Drawing Preparation : Adequate control of field […]

TES-P-122.09

CLEARANCES AND RIGHT OF WAY REQUIREMENTS, SEC (Saudi Electricity Company) STANDARD, Transmission Engineering Standard (TES) The purpose of this standard is to highlight National Gird Saudi Arabia practices with respect to the clearances required for various paralleling and crossing facilities and Right of Way (ROW) requirements for the design of overhead transmission lines. The designs […]

Method Statement for construction of Access Road and Structure Pads

Access Roads and structure pads prepare for Transmission line in Saudi Arabia, And proper work procedure and methods statement bellow, requirements Sub Grade, Sub Base layer and final layer. The Access road is connected to every Structure Pads and Towers. This roads is carriable heavy loads vehicle. The Access road is not made of Cement […]

WEIGHT SPAN AND WIND SPAN

Transmission Line Survey span weight span wind span definition:- Introduction:- This is the definition of the Transmission line survey wind span and weight span. In the transmission line survey, we used common terms likes what is the weight span wind span, Hot curve, cold curve etc.      Sometimes we face problems with some terms […]